modem 4G avec batterie intégrée 5 h d'autonomiemodem 4G avec batterie intégrée 5 h d'autonomie
  • New
Invisible Bluetooth Headset - Discreet Invisible EarpieceBluetooth kit Invisible earpiece for discreet communication
  • New
  • Out-of-Stock
  • New
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone

    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone

    €99.00
    Tax Included
    Reviews (4)

    Written by Charles on 01/15/2024 ★★★★★

    "Very accurate GPS and the app is much better than the others. I highly recommend it. Plus, their customer service is excellent."

    Quantity :
    • 100% French company, reliable and attentive100% French company, reliable and attentive
    • The know-how of our experts since 2011The know-how of our experts since 2011
    • Discreet next day delivery before 1pmDiscreet next day delivery before 1pm
    4GM3 mini photo

    4G GPS tracker without subscription - with Spy Microphone for optimal surveillance thanks to the 4G network

    This advanced GPS tracker, equipped with a spy microphone, allows for discreet remote monitoring. Thanks to the GNSS system, location is more precise. With 4G and 2G, it guarantees a reliable signal even in areas with poor coverage.

    Powered by a prepaid SIM card with data (not included), no subscription is required. It offers optimal control via an intuitive app.

    How is the position of the GPS tracking box determined?

    This device uses efficient location tracking: GNSS (Global Navigation Satellite System, including GPS and other satellite systems) for maximum accuracy. In addition, it uses the 2G network for areas where GPS is less effective. The application stores and restores routes when the connection is reestablished.

    What is the GNSS system for GPS car tracking?

    GNSS (Global Navigation Satellite System) is a global navigation system that includes GPS, Galileo, GLONASS , and BeiDou. It provides more accurate and reliable location tracking than GPS alone.

    What types of alerts does the 4G GPS tracker send without a subscription?

    Via the application it is possible to program several alerts; vibration alert, movement alert (from 100 to 9999 m), tilt alert (from 5° to 180°), equipped with a light detector it sends an alert if it is torn off, the alert for leaving the geofence zone, fall alert and even a speeding alert (from 1 to 255 km/h) .

    What is geofencing and how does it work?

    Geofencing allows you to create a virtual barrier around an area defined via the app. As soon as the tracker enters or leaves this perimeter, an alert is sent to the app, allowing you to proactively track movements.

    What are the main features of this car GPS tracking system?

    Compatible with 4G and 2G , this tracker provides real-time tracking with journey recording , as well as a parking report and history of distances traveled . Its integrated spy microphone allows you to listen remotely in real time (range 1 to 2 m), and its powerful magnet ensures secure attachment to metal surfaces.

    What is the battery life of this 4G GPS tracker without a subscription?

    The battery provides 6 days of active use , 15 days of power saving and up to 30 days of standby . This intelligent power management allows for less frequent recharging while ensuring continuous monitoring.

    Can you listen remotely with this car GPS tracking?

    Yes, this tracker is equipped with a GSM spy microphone allowing live listening with a simple command. The device does not have automatic sound detection, but for this type of functionality, we invite you to consult our range of GSM spy microphones .

    Is the GPS tracker resistant to outdoor conditions?

    Yes, thanks to its IP65 certification, it is designed to resist water and dust, ensuring optimal operation even in harsh environments.

    How accurate is the location of the car monitoring GPS?

    The app indicates the type of geolocation used (GNSS, 2G). Accuracy is 5 meters with GNSS, and varies between 100 meters and 2 km with the mobile network. You can check network coverage on this site.

    📢 Check the network before use: This device uses the 4G network (in addition to 2G), like mobile phones, offering better coverage than 2G. Check network availability according to your location at monreseaumobile.arcep.fr .
    TAG3

    Data sheet

    Autonomy
    6 mois
    Country of manufacture
    RPC

    Specific References

    MPN
    TAG3
    Zara2026-10-20
    Avis Vérifié

    J'aime bcp, il grade l'hostorique des trajet come un gps.

    Lucas2026-09-22
    Avis Vérifié

    placer pour surveiller ma fille. il est vraiment indétctable.

    Aria2026-09-20
    Avis Vérifié

    Parfait, j'ai suivie ma valise pendant un voyage. ce tag carte donne aussi les trajets avec historique. Prix imbatable pour une utilisation de 3 ans tout compris !

    JJ2026-09-01
    Avis Vérifié

    pratique à placer. les positions sont justes très souvent. je peux rester sans position plus d'une heure mais c'est rae. si non dans l'ensmble bon prodiot indétécable.

    Write your review
    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone

    You might also like

    Micro and 4G GPS Tracker without subscription real-time location

    copy of copy of copy of GPS tracking box - via 4G waterproof with integrated microphone

    €99.00
    Tax Included